the ‘blank slate,’ (backyard phase)
before images of backyard portion + first design proposition sketches done post client survey 1 and then 2 (sketches took ~6 hours each to produce, at $40/hour plus 8.8% tax) | started dec 2022, still underway
Click here to see video 1 of progress as of august 1st. Where once was mostly sod except 2 large rhododendrons, now are new plantings, protection for vulnerable new plants, weed fabric, containers with new plants, drip irrigation, and mulch. video 2 here and video 3 here
timber retaining wall
designed with client, installed | may-jul 2019
garden with flagstone path
designed + installed | sep-oct 2015
deer resistant woodland garden
designed + installed | apr 2016
romanstack retaining wall
prepared foundation and laid base block layers for client to easily finish | may-jun 2019
woodland stream
designed and installed | fall 2014-spring 2015